Construction materials are in scope.
“The partnership with Terrascope has been an amazing one from the beginning… We have carried out several CO2 emissions calculations together, but this is not where it is ending.”
Gianni Moor
Member, Board of Directors,
Tectus Group
4-6 Weeks
vs. 6-12 months traditional typical FLAG submission time frame.
100% Pass Rate
for audit and SBTi Approvals
600M+
tonnes of CO₂ measured across customers
92%
Accuracy vs. actual supplier data when estimating
200K+ Emission Factors
with FLAG, LUC, & LM breakdowns
80%
reduction in measurement cycles
50x Faster
than traditional LCAs for product emissions
5x Faster
faster measurement and savings of up to USD160k
10 years
of sustainability experience Terrascope is an Olam venture.
| Before Terrascope | After Terrascope | |
|---|---|---|
| Embodied carbon capability | Outsourced, expensive | In-house, scalable |
| Material comparison | Generic databases | Supplier-specific EPDs |
| Client deliverables | Basic estimates | Full LCA reports |
| Project win rate | Losing RFPs | Competitive advantage |
| Time per assessment | Weeks | Hours |
Building codes are moving faster than most firms can adapt
- Embodied carbon requirements appearing in RFPs and building codes
- Material EPDs are scattered and inconsistent
- Lifecycle assessments are expensive and slow when outsourced
- Steel and cement are CBAM-affected, changing material economics
Get the clarity to build your firm’s competitive edge
- Material emissions database covering construction products
- CBAM-ready for steel, cement, aluminum imports into EU
- Lifecycle assessment capabilities at project scale
- Supplier engagement for EPD collection
- Integration with BIM and design tools
Reduce complexity and uncertainty, so you can focus on strategy, not spreadsheets
- Material comparison in hours, not weeks
- CBAM calculations for affected materials
- Full project lifecycle from design to demolition
- Audit-ready for building certification requirements
Tailored solutions for different company profiles
If you Have Data,
But Need Compliance
"We measured Scope 3 with industry averages or third-party tools. Now LSR regulations require land-specific breakdowns we don't have."
Land Sector EF Disaggregation
- Auto-tagging of proprietary emissions factor databases into LSR-specific requirements
- Monthly office hours with LSR Expert
Facing Customer/SBTi Pressure
"Customers want product-level carbon footprints. broken out by land emissions categories. Our industry-average numbers make us look worse than competitotrs with farm-level data."
"We need to quantify progress vs our SBTi targets."
Farm-level emissions calculation to prove lower impact and win contracts
- Proprietary, commodity-specific templates for farm-level data collection
- Scalable across owned farms and suppliers
- Monthly expert office hours included
- Monthly office hours with LSR Expert
Real Results from Industry Leaders
16% Lower Emissions vs Industry Benchmark Custom EF development
130K line items in 2 weeks at 92% accuracy
Measured 5,000 SKUs in 100 minutes
16% Lower Emissions vs Industry Benchmark Custom EF development
130K line items in 2 weeks at 92% accuracy
Measured 5,000 SKUs in 100 minutes
Regulatory Requirements for Engineering & Architecture Companies
See which regulation applies to your jurisdiction, and what it means for your business.
Europe
| Regulation | Deadline | What It Means |
|---|---|---|
| CBAM | Jan 2026 | Steel, cement, aluminum certificates required. €100/tonne penalty. Affects all EU projects. |
| EPBD Recast | 2027-2030 | Whole-life carbon disclosure for new buildings. Embodied carbon limits coming. |
| CSRD | 2025-2028 | Large firms need sustainability reporting including project impacts. |
United States
| Regulation | Deadline | What It Means |
|---|---|---|
| California Buy Clean | Active | State-funded projects require EPDs for steel, glass, mineral wool. Expanding to other materials. |
| Federal Buy Clean | Active | Federal projects increasingly require embodied carbon disclosure. |
Australia
| Regulation | Deadline | What It Means |
|---|---|---|
| AASB S2 | Jan 2025+ | Large construction and engineering firms in scope. |
| Green Star | Ongoing | Industry standard increasingly requires lifecycle carbon assessment. |
Singapore/APAC
| Regulation | Deadline | What It Means |
|---|---|---|
| BCA Green Mark | Ongoing | Singapore building certification with embodied carbon requirements. |
| Japan ZEB/ZEH | 2030 targets | Net-zero energy buildings pushing toward net-zero carbon. |
FAQ
How does Terrascope help AEC firms replace spend-based Scope 3 estimates with activity/supplier data—without double counting?
Terrascope runs structured data campaigns to collect activity and supplier data, applies region-appropriate emission factors with version control, and supports supplier-specific remapping/overrides so categories use consistent factors. Terrascope also shows data coverage and sources and provides re-baselining guidance when methods change.
Can Terrascope deliver audit-ready outputs for CBAM and NGER, and provide defensible estimates when month-end data is delayed?
Yes. For CBAM, Terrascope produces an EU-template-aligned Excel (e.g., HS/CN codes, supplier/installation IDs), runs governed rolling data requests, and documents any use of transitional defaults. For NGER, outputs can include energy in GJ (including kWh→GJ conversions) with factor/version audit trails. When actuals are delayed, Terrascope can provide documented, site-level estimates using production-intensity models (accounting for shutdowns and site materiality), then back-solve once actuals land.
How does Terrascope integrate with SAP and bill-scanning tools, and support product-level PCF/BOM allocation and EPD preparation across multi-site operations?
Terrascope ingests manual or automated feeds, normalizes SAP and bill-scan outputs, and sets up recurring monthly ingestion with transformations and site/BU mapping (including flags for unattributed items). For PCF/BOM, the platform allocates shared site energy by product, supports packaging and recycled content, multi-mode transport, and custom factors, making annual refreshes easier. For EPD readiness, Terrascope combines supplier primary data with PCF outputs to populate EPD inputs and helps you start with priority products and scale.
Resources

